Multi Apex Factory - Badr CITY

comprehensive renovation of the factory was carried out, including construction works, paints, epoxy, and renovation of bathroom units, changing street sidewalks and pouring concrete for the streets.

Dawlia Extru coat21 - 6 October CITY

The first and second phases of the International 21 factory for extruding aluminum sections were constructed under the supervision of Dr. Alaa El-Sayed Consulting office. The project was completed from excavation to final delivery with a total value of the first phase 25 million pounds.

Nestle - 6 October CITY

The engineers building in the Nestlé factory was completely constructed from the drilling stages to its delivery

The project was implemented in 4 months with a high quality of implementation and under the supervision of the Engineering Department and the GRAPHCO Consulting Office

SEDICO Factory - 6 October CITY

Sedcoa Pharmaceutical Factory is one of the largest pharmaceutical factories in Egypt. Concrete was poured into the drug store, and the sewage and feeding station for the factory was made under the supervision of Dr. Eng. Sayed Al-Qasabi.

Americana Plaza - At the sheikh zayed CITY

IN-DOORS Epoxy painting flooring clarifying the Glossiness of surface            

IN-DOORS Epoxy painting flooring & IN-DOORS Plastic painting walls 

Cairo University - At the giza

IN-DOORS Self-Leveling (1.5mm) Epoxy Flooring          

FOR GRAY COLOR

TEMSA EGYPT Factory for Buses Manufacturing - At the 10th of RAMADAN CITY

For the factory which power trowel finished with top hardener  to get anti- abrasion smooth texture surface

IN-DOORS Epoxy Flooring Systems: 3mm Self-Leveling for Orange & Yellow Strips, and 400 Microns High-Build Coating for Gray Strip.

Rameda Pharmaceutical - At the 10th of RAMADAN CITY

IN-DOORS Epoxy Painting Flooring System

Maadi Tower - At the Cairo CITY

Some stages for Strengthening and maintenance for the slab

DP World

OFI - Herb factory Beni Suef City

The administrative building of the Herbal Factory has been fully completed to the highest standards, showcasing premium finishes and meticulous attention to detail.

CD Project – Onion Factory:
A fully integrated development featuring the factory’s largest production line — a cutting-edge onion drying unit.

OFI - Herb factory Beni Suef City

The administrative building of the Herbal Factory has been fully completed to the highest standards, showcasing premium finishes and meticulous attention to detail.

OFI - CD Project inside the onion factory

CD Project – Onion Factory:
A fully integrated development featuring the factory’s largest production line — a cutting-edge onion drying unit.