
comprehensive renovation of the factory was carried out, including construction works, paints, epoxy, and renovation of bathroom units, changing street sidewalks and pouring concrete for the streets.
The first and second phases of the International 21 factory for extruding aluminum sections were constructed under the supervision of Dr. Alaa El-Sayed Consulting office. The project was completed from excavation to final delivery with a total value of the first phase 25 million pounds.
The engineers building in the Nestlé factory was completely constructed from the drilling stages to its delivery
The project was implemented in 4 months with a high quality of implementation and under the supervision of the Engineering Department and the GRAPHCO Consulting Office
Sedcoa Pharmaceutical Factory is one of the largest pharmaceutical factories in Egypt. Concrete was poured into the drug store, and the sewage and feeding station for the factory was made under the supervision of Dr. Eng. Sayed Al-Qasabi.
IN-DOORS Epoxy painting flooring clarifying the Glossiness of surface
IN-DOORS Epoxy painting flooring & IN-DOORS Plastic painting walls
IN-DOORS Self-Leveling (1.5mm) Epoxy Flooring
FOR GRAY COLOR
For the factory which power trowel finished with top hardener to get anti- abrasion smooth texture surface
IN-DOORS Epoxy Flooring Systems: 3mm Self-Leveling for Orange & Yellow Strips, and 400 Microns High-Build Coating for Gray Strip.
IN-DOORS Epoxy Painting Flooring System
Some stages for Strengthening and maintenance for the slab
The administrative building of the Herbal Factory has been fully completed to the highest standards, showcasing premium finishes and meticulous attention to detail.
CD Project – Onion Factory:
A fully integrated development featuring the factory’s largest production line — a cutting-edge onion drying unit.